Aerial view of a large modern warehouse with a white and gray exterior, green accents, and a vast parking lot surrounded by trees and a cityscape in the background.

Powered up and ready 

Welcome to spark

SPARK is a 21st century logistics and manufacturing hub and consists of 7 units totalling 620,000sq ft of high specification floor space. It is located right by junctions 9 and 10 of the M6 and sits in the heart of the Midlands. SPARK is progressing in two phases:

Phase One includes two buildings (18,000 and 250,000 sq ft) which are ready to occupy now, they are delivered by Origin. The remaining unit in Phase One is being delivered by HBD.

Phase Two will introduce four new buildings totalling 182,377 sq ft; three will be developed by Origin and ready to occupy in Q4 2026. The fourth will be delivered by HBD.

Logo with a geometric design and the text "ORIGIN FUTURE LOGISTICS".
Black background with white intersecting lines arranged in a circular pattern.

UNITS & MASTERPLAN

MASTERPLAN
Minimalist illustration of a park with a bench, three trees of different sizes, against a black background.
Outline of two people standing side by side, one holding a leaf.
UNIT A
UNIT B
Outline illustration of a desk with a calculator, a pen, and three plants.
Outline of a neon yellow police hat on a black background
UNIT G

620,000 SQ FT

ACROSS 44 ACRES


18,000 – 250,000 SQ FT

UNITS AVAILABLE


NET ZERO CARBON

CAPABILITY


J9 AND J10 OF M6

LOCATION


12MVA

ALLOCATED POWER LOAD


B2 AND B8

USES


READY TO OCCUPY NOW

UNITS A & G


EXTENSIVE LABOUR POOL

AVAILABLE IN REGION


On track

Q4 2021

Planning Permission Granted for Site Preparation and Outline Planning Granted for 620,000 sq ft B2 and B8

Icon of a checklist with a checkmark inside a circle, indicating completion or approval.

Q2 2022

A gauge or meter illustration with a needle pointing to the top, enclosed within a circle.

Site Preparation Works Commenced


Q2 2024

Icon of two overlapping documents on a black background

Reserved Matters planning approved for Unit A, B & G


Q3 2024

Icon of two construction workers wearing hard hats within a circle.

Site Preparation Complete


Q1 2025

Outline icon of an excavator with a bucket arm and tracks inside a circular border.

Start on Site Construction Phase 1 – Unit A, B & G


HY1 2025

Reserved Matters Planning Permission Phase 2 – Unit C, D, E & F

Icon of two overlapping documents with lines of text, all within a circle.

HY2 2025

Line graph with bars and a zigzag line on a black background.

Completion Phase 1 – Unit A, B, G Ready to Occupy


HY2 2025

Icon of a hard hat, gear, and pie chart, representing construction or project management.

Start on Site Construction Phase 2 – Unit C, D, E & F


2026

Line graph with upward trend and check mark indicating improvement or success.

Completion Phase 2 - Unit C, D, E & F Ready to Occupy